News

Tunneling and Groundwater Information Shared with Lazo Area Residents

16 July 2021


In March 2021, the CVRD hosted a webinar for residents within the proposed tunneling area in Area B (Lazo area). The online session provided additional information about the groundwater monitoring and assessment work that has been completed to date, and the further planning that will be done before construction starts on the new sewer conveyance route, selected by the Sewage Commission in February. The project team responded to a number of questions from residents about potential impacts to their property, protection measures that are being planned, and other planning details.

The information is now posted for anyone who was unable to attend:

  • Video of the session is now posted the at Engage Comox Valley, Let's Talk Poop, LWMP Page - you can find it in the videos section in the righthand menu.
  • While many questions were addressed during the 1.5 hour session, there were a few that required follow up. Those questions, along with the responses, are now posted in the FAQ section of the LWMP Connect CVRD page located in the right-hand menu bar.

Any further questions? Share them here in the Questions tab.