Welcome Comox Pump Station Neighbours Online Engagement
The survey is now closed.
Thank you to everyone who took the time to participate.
We had 30 people provide submissions about their preferred design features, and the results of that input have given the project team clear guidance on the preferred design for this important infrastructure.
The combined submissions from the in-person and online engagement opportunities showed a clear preference for Option 1 design features.
This included the preferred approach for:
- Extension Siding: Charcoal, vertical, modern metal
- Roofline: Flat over entire facility
- Front landscaping: Cedar hedging
- Fencing: Charcoal/black vertical post metal fence
- South-east side finishes: Cedar hedging
A letter has been delivered to homes in the area, with additional information about further comments and feedback received. That letter is also posted below, under “Links”
The CVRD will now work with the Town of Comox to complete the development variance permit and required approvals. Preparatory work at the site will begin in April.